Site Selection to Minimize Interconnect Costs - Small/Medium Utility-Scale Projects
For a developer siting projects today, small/medium utility scale projects can be a great option if you can find locations with low interconnection upgrades. Those projects can still achieve similar economics to larger ones once transmission and proximity to load are considered.

Drew Philpot
Jul 17, 2024


Site Selection to Minimize Interconnect Costs - Core Problems Driving the Infrastructure Need
FERC 2023 and other recent reforms are encouraging steps to help the US power grid adapt to the energy transition. However, the risks to...

Drew Philpot
Jun 7, 2024